EOI was the prime contractor for the site characterization and remediation of 24 former MGP sites. Scopes of Work varied at each site, but in most every case involved extensive site sampling, development and installation of temporary fabric structures and air filtration systems, and remediation. A number of sites required pre-demo asbestos inspections, abatement, and demolition.
All sites were entered into their respective state’s voluntary cleanup programs, so EOI was responsible for all program-required reporting, including Site Investigation Reports, Remedial Objectives Reports, Remedial Action Plans, and Remedial Action Completion Reports, in order to achieve No Further Action status from each state. EOI’s former MGP sites include:
- Carondelet Coke, St. Louis, Missouri
- Mattoon, Illinois
- Columbia, Missouri
- Charleston, Illinois
- Moberly, Missouri
- Granite City, Illinois
- Excelsior Springs, Missouri
- Pana, Illinois
- Independence, Missouri
- Paris, Illinois
- Kansas City, Missouri
- Canton, Illinois
- Galva, Illinois
- Beardstown, Illinois
The Power Plant
This $12 million renovation has transformed the 20,000 square foot, single-level former coal-burning power plant into a four-level entertainment and dining complex.